About: HMAS Labuan (L3501)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

LST 3501 was built by Canadian Vickers at their shipyard in Montreal, Canada. The vessel was launched on 31 August 1944.[citation needed] The Mark 3 LST had a light load displacement of , with a maximum beachable displacement of beaching. They were in length overall, with a beam of , and a maximum draught of at the stern. Propulsion was provided by triple expansion engines, which delivered to the two propellers. Maximum speed was , with a range of at . The LCTs had a ship's company of 104, and a maximum load of 168 troops, 18 40-ton tanks, 27 trucks, and 7 Landing Craft Mechanized. In RAN service, LST 3501 was armed with ten 20 mm Oerlikons: four twin and two single mounts.

AttributesValues
rdf:type
rdfs:label
  • HMAS Labuan (L3501)
rdfs:comment
  • LST 3501 was built by Canadian Vickers at their shipyard in Montreal, Canada. The vessel was launched on 31 August 1944.[citation needed] The Mark 3 LST had a light load displacement of , with a maximum beachable displacement of beaching. They were in length overall, with a beam of , and a maximum draught of at the stern. Propulsion was provided by triple expansion engines, which delivered to the two propellers. Maximum speed was , with a range of at . The LCTs had a ship's company of 104, and a maximum load of 168 troops, 18 40-ton tanks, 27 trucks, and 7 Landing Craft Mechanized. In RAN service, LST 3501 was armed with ten 20 mm Oerlikons: four twin and two single mounts.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • HMAS Labuan leaving Williamstown, Victoria for Macquarie Island in May 1949
Ship image
  • 300(xsd:integer)
module
  • --08-31
abstract
  • LST 3501 was built by Canadian Vickers at their shipyard in Montreal, Canada. The vessel was launched on 31 August 1944.[citation needed] The Mark 3 LST had a light load displacement of , with a maximum beachable displacement of beaching. They were in length overall, with a beam of , and a maximum draught of at the stern. Propulsion was provided by triple expansion engines, which delivered to the two propellers. Maximum speed was , with a range of at . The LCTs had a ship's company of 104, and a maximum load of 168 troops, 18 40-ton tanks, 27 trucks, and 7 Landing Craft Mechanized. In RAN service, LST 3501 was armed with ten 20 mm Oerlikons: four twin and two single mounts.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software