About: Apperley Bridge railway station   Sponge Permalink

An Entity of Type : dbkwik:resource/sQr5d_oekNKOt18W27NtWg==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Go-ahead for construction of both Kirkstall Forge and Apperley Bridge was given in the National Infrastructure Plan released on 29 November 2011. The estimated completion date is March 2015.

AttributesValues
rdf:type
rdfs:label
  • Apperley Bridge railway station
rdfs:comment
  • Go-ahead for construction of both Kirkstall Forge and Apperley Bridge was given in the National Infrastructure Plan released on 29 November 2011. The estimated completion date is March 2015.
sameAs
dcterms:subject
dbkwik:uk-transpor...iPageUsesTemplate
dbkwik:uktransport...iPageUsesTemplate
pregroup
Previous
Platforms
  • 4(xsd:integer)
Original
Events
  • Station closes
  • Projected re-opening.
  • Station opens as Apperley Bridge
  • Station renamed Apperley
  • Station renamed Apperley Bridge
  • Station renamed Apperley Bridge and Rawdon
  • Station renamed Apperley and Rawdon
Name
  • Apperley Bridge
Locale
borough
Years
  • 1847(xsd:integer)
  • 2014(xsd:integer)
  • 1890-10-01(xsd:date)
  • 1961-06-12(xsd:date)
  • 1965-03-20(xsd:date)
  • Late July 1846
  • May 1893
gridref
  • SE196383
Latitude
  • 53(xsd:double)
Longitude
  • -1(xsd:double)
NEXT
postgroup
Route
abstract
  • Go-ahead for construction of both Kirkstall Forge and Apperley Bridge was given in the National Infrastructure Plan released on 29 November 2011. The estimated completion date is March 2015.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software