About: STS-29   Sponge Permalink

An Entity of Type : dbkwik:resource/G7YR4yAvfoe7I_ap4nmguQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.

AttributesValues
rdf:type
rdfs:label
  • STS-29
rdfs:comment
  • STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.
sameAs
COSPAR ID
  • 1989(xsd:integer)
dcterms:subject
dbkwik:nasa/proper...iPageUsesTemplate
crew4 up
Previous Mission
crew size
  • 5(xsd:integer)
landing date
  • --03-18
flights1 up
  • Second
SATCAT
  • 19882(xsd:integer)
Mission Duration
  • 430732.0
crew photo caption
  • Back row, L-R: Bagian, Springer, Buchli. Front row, L-R: Blaha and Coats.
Name
  • STS-29
crew1 up
crew3 up
terminology
  • Astronaut
Insignia
  • Sts-29-patch.png
Image caption
  • TDRS-D being deployed on Flight Day 1 of the mission.
crew photo
  • STS-29_crew.jpg
orbit period
  • 5436.0
orbit inclination
  • 28(xsd:double)
crew2 up
Operator
flights3 up
  • First
launch site
crew5 up
Mission Type
  • Satellite deployment
flights2 up
  • First
landing site
  • Edwards Runway 22
apsis
  • gee
orbit regime
Programme
Launch date
  • --03-13
flights4 up
  • Third
crew members
Position
  • Pilot
  • Commander
  • Mission Specialist 1
  • Mission Specialist 2
  • Mission Specialist 3
orbits completed
  • 80(xsd:integer)
flights5 up
  • First
Next Mission
orbit reference
abstract
  • STS-29 was a NASA Space Shuttle mission, during which Space Shuttle Discovery inserted a Tracking and Data Relay Satellite (TDRS) into Earth orbit. It was the third shuttle mission following the Challenger disaster of 1986, and launched from Kennedy Space Center, Florida, on 13 March 1989. STS-29 was the eighth flight of Discovery and the 28th Space Shuttle mission overall; its planned predecessor, STS-28, was delayed until August 1989.
is Previous Mission of
is Mission of
is Next Mission of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software