About: Bridge Control Puzzle   Sponge Permalink

An Entity of Type : owl:Thing, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The Bridge Control is a puzzle found in Silent Hill: Shattered Memories. Harry Mason and Dahlia Mason are driving home when they have to stop due to the raised bridge. Harry exits the car, jumps the railing and ascends the ladder of the control tower on the right side of the road. Once in the maintenance room, he finds a control panel with three levers, four little lights and a red button on the left.

AttributesValues
rdfs:label
  • Bridge Control Puzzle
rdfs:comment
  • The Bridge Control is a puzzle found in Silent Hill: Shattered Memories. Harry Mason and Dahlia Mason are driving home when they have to stop due to the raised bridge. Harry exits the car, jumps the railing and ascends the ladder of the control tower on the right side of the road. Once in the maintenance room, he finds a control panel with three levers, four little lights and a red button on the left.
  • The aim is to build a model of a bridge using the blocks strewn below. The blocks need to be placed on the first one in the proper order as determined by the carved symbol on each block. Choosing a wrong block will make the whole bridge collapse. The last block has the up and down arrows on it, and using these arrows the bridge can be folded down into stairs or back up. The lake should be drained using the cannon before the bridge can be lowered.
dcterms:subject
dbkwik:silenthill/...iPageUsesTemplate
abstract
  • The Bridge Control is a puzzle found in Silent Hill: Shattered Memories. Harry Mason and Dahlia Mason are driving home when they have to stop due to the raised bridge. Harry exits the car, jumps the railing and ascends the ladder of the control tower on the right side of the road. Once in the maintenance room, he finds a control panel with three levers, four little lights and a red button on the left.
  • The aim is to build a model of a bridge using the blocks strewn below. The blocks need to be placed on the first one in the proper order as determined by the carved symbol on each block. Choosing a wrong block will make the whole bridge collapse. The last block has the up and down arrows on it, and using these arrows the bridge can be folded down into stairs or back up. The lake should be drained using the cannon before the bridge can be lowered.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software