About: Cape Canaveral Air Force Station Space Launch Complex 41   Sponge Permalink

An Entity of Type : dbkwik:resource/106RTUxt3Es8Y4msrbNF_g==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The Titan III launch facilities at CCAFS were built as part of an Integrate-Transfer-Launch approach intended to enable a rapid launch rate. Titan vehicles were assembled and integrated with their payloads off-pad and then transported by rail to one of the two pads. The Titan III facilities included both LC-40 and LC-41, assembly buildings including the Vertical Integration Building, and the first rail line at the Cape. The facilities were completed in 1964 and the first launch from LC-41 was of a Titan IIIC, carrying four separate payloads, on December 21, 1965.

AttributesValues
rdf:type
rdfs:label
  • Cape Canaveral Air Force Station Space Launch Complex 41
rdfs:comment
  • The Titan III launch facilities at CCAFS were built as part of an Integrate-Transfer-Launch approach intended to enable a rapid launch rate. Titan vehicles were assembled and integrated with their payloads off-pad and then transported by rail to one of the two pads. The Titan III facilities included both LC-40 and LC-41, assembly buildings including the Vertical Integration Building, and the first rail line at the Cape. The facilities were completed in 1964 and the first launch from LC-41 was of a Titan IIIC, carrying four separate payloads, on December 21, 1965.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Site
Short
  • SLC-41
paddetails
  • --12-21
Name
  • Space Launch Complex 41
Caption
  • An aerial view of SLC-41. The Atlas V on the pad is the one used to launch New Horizons to Pluto.
pads
  • 1(xsd:integer)
Inclination
  • 28(xsd:integer)
Operator
tlaunches
  • 61(xsd:integer)
abstract
  • The Titan III launch facilities at CCAFS were built as part of an Integrate-Transfer-Launch approach intended to enable a rapid launch rate. Titan vehicles were assembled and integrated with their payloads off-pad and then transported by rail to one of the two pads. The Titan III facilities included both LC-40 and LC-41, assembly buildings including the Vertical Integration Building, and the first rail line at the Cape. The facilities were completed in 1964 and the first launch from LC-41 was of a Titan IIIC, carrying four separate payloads, on December 21, 1965.
is sites of
is launch site of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software