About: Monastery of the Urbans   Sponge Permalink

An Entity of Type : owl:Thing, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Construction started on February 26, 1881. The storm of 1882 destroyed much of the construction site and work had to start all over again. Because the project was financially in troubles, the storm had caused a lot of damage, the east side was made smaller a few metres. The building was finally finished on July 8, 1883, a few months before the Hurbanova Town Hall was finished. The building survived the 1884 fire, just like the town hall.

AttributesValues
rdfs:label
  • Monastery of the Urbans
rdfs:comment
  • Construction started on February 26, 1881. The storm of 1882 destroyed much of the construction site and work had to start all over again. Because the project was financially in troubles, the storm had caused a lot of damage, the east side was made smaller a few metres. The building was finally finished on July 8, 1883, a few months before the Hurbanova Town Hall was finished. The building survived the 1884 fire, just like the town hall.
dcterms:subject
abstract
  • Construction started on February 26, 1881. The storm of 1882 destroyed much of the construction site and work had to start all over again. Because the project was financially in troubles, the storm had caused a lot of damage, the east side was made smaller a few metres. The building was finally finished on July 8, 1883, a few months before the Hurbanova Town Hall was finished. The building survived the 1884 fire, just like the town hall. In 1923, the monastery was abandoned and the major tunnel system underneath the building began collapsing. The building sank over 5 metres and a layer of sand was put upon it, so nobody could see it anymore. The roof collapsed and the building was totally flooded with sand. People forgot about the building. On 5th of August, 2008, archeologists dug up the remainings of the old monastery adjacent to the Saint Urban's Cathedral. Though the monastery had sunken over 5 metres it was still in a very good shape. Mayor Ben OpaĆ„ started to renovate the building to make a tourist attraction of it. Therefore, the monastery had to be heightened to the current street level of Hurbanova. The building was raised using over fifty jacks and hung in the air for a week. Then, tens of trucks carrying sand arrived and filled the huge gap. The building was lowered and there was a perfect fit. The building was ready for the restoration. The roof and windows were gone, so they had to be manufactured and put into position. Because the delivery time was August 16, the people working on it only had four days to work on it. After just eleven days the building was already open for the public.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software