STS-51 was notable for having been scrubbed three times on the launchpad, each time after the crew had boarded the spacecraft:
* On 17 July 1993, the launch was scrubbed on the pad due to a flaw in the pyrotechnic initiator controller that triggers the release of the solid rocket boosters from the mobile launcher platform.
* On 24 July 1993, problems with a hydraulic power unit in one of the solid rocket boosters caused another scrub on the pad. Because of the Perseid meteor shower, the next launch window did not open until the second week of August.
* On 12 August 1993, the count reached the T−3 second mark, at which point the Space Shuttle Main Engine (SSMEs) had ignited. A shutdown was then triggered by faulty fuel flow sensors in one of the SSMEs.
* STS-51 successfully la
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - STS-51 was notable for having been scrubbed three times on the launchpad, each time after the crew had boarded the spacecraft:
* On 17 July 1993, the launch was scrubbed on the pad due to a flaw in the pyrotechnic initiator controller that triggers the release of the solid rocket boosters from the mobile launcher platform.
* On 24 July 1993, problems with a hydraulic power unit in one of the solid rocket boosters caused another scrub on the pad. Because of the Perseid meteor shower, the next launch window did not open until the second week of August.
* On 12 August 1993, the count reached the T−3 second mark, at which point the Space Shuttle Main Engine (SSMEs) had ignited. A shutdown was then triggered by faulty fuel flow sensors in one of the SSMEs.
* STS-51 successfully la
|
sameAs
| |
COSPAR ID
| |
dcterms:subject
| |
dbkwik:nasa/proper...iPageUsesTemplate
| |
crew4 up
| |
Previous Mission
| |
crew size
| |
landing date
| |
flights1 up
| |
SATCAT
| |
Mission Duration
| |
crew photo caption
| - Left to right: Culbertson, Bursch, Walz, Readdy, Newman
|
Name
| |
crew1 up
| |
crew3 up
| |
terminology
| |
Insignia
| |
Image caption
| - Discovery in orbit, seen from the SPAS astronomy platform
|
crew photo
| |
orbit period
| |
orbit inclination
| |
crew2 up
| |
Operator
| |
flights3 up
| |
launch site
| |
crew5 up
| |
Mission Type
| - Astronomy
- Satellite deployment
|
flights2 up
| |
landing site
| |
apsis
| |
orbit regime
| |
Programme
| |
Launch date
| |
flights4 up
| |
crew members
| |
Position
| - Pilot
- Commander
- Mission Specialist 1
- Mission Specialist 2
- Mission Specialist 3
|
orbits completed
| |
flights5 up
| |
Next Mission
| |
orbit reference
| |
abstract
| - STS-51 was notable for having been scrubbed three times on the launchpad, each time after the crew had boarded the spacecraft:
* On 17 July 1993, the launch was scrubbed on the pad due to a flaw in the pyrotechnic initiator controller that triggers the release of the solid rocket boosters from the mobile launcher platform.
* On 24 July 1993, problems with a hydraulic power unit in one of the solid rocket boosters caused another scrub on the pad. Because of the Perseid meteor shower, the next launch window did not open until the second week of August.
* On 12 August 1993, the count reached the T−3 second mark, at which point the Space Shuttle Main Engine (SSMEs) had ignited. A shutdown was then triggered by faulty fuel flow sensors in one of the SSMEs.
* STS-51 successfully launched on 12 September 1993.
|
is Previous Mission
of | |
is Mission
of | |
is Next Mission
of | |