About: Fargo-class cruiser   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The Fargo-class cruisers were a modified version of the previous Cleveland-class light cruiser design; the main difference was a more compact pyramidal superstructure with single trunked funnel, intended to improve the arcs of fire of the anti-aircraft (AA) guns. The same type of modification differentiated the Baltimore and Oregon City classes of heavy cruisers. In all, 13 ships of the class were planned but only USS Fargo (CL-106) and USS Huntington (CL-107) were ever completed, the rest being cancelled at varying states of completion with the de-escalation of World War II.

AttributesValues
rdf:type
rdfs:label
  • Fargo-class cruiser
rdfs:comment
  • The Fargo-class cruisers were a modified version of the previous Cleveland-class light cruiser design; the main difference was a more compact pyramidal superstructure with single trunked funnel, intended to improve the arcs of fire of the anti-aircraft (AA) guns. The same type of modification differentiated the Baltimore and Oregon City classes of heavy cruisers. In all, 13 ships of the class were planned but only USS Fargo (CL-106) and USS Huntington (CL-107) were ever completed, the rest being cancelled at varying states of completion with the de-escalation of World War II.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • USS Fargo
Ship image
  • 300(xsd:integer)
abstract
  • The Fargo-class cruisers were a modified version of the previous Cleveland-class light cruiser design; the main difference was a more compact pyramidal superstructure with single trunked funnel, intended to improve the arcs of fire of the anti-aircraft (AA) guns. The same type of modification differentiated the Baltimore and Oregon City classes of heavy cruisers. In all, 13 ships of the class were planned but only USS Fargo (CL-106) and USS Huntington (CL-107) were ever completed, the rest being cancelled at varying states of completion with the de-escalation of World War II. Fargo, the lead ship of the class, was launched on 25 February 1945, but was not commissioned until 9 December 1945, shortly after the war ended. Huntington was commissioned early in 1946. The two ships were decommissioned in 1949-1950, and never reactivated.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software