About: USS Abraham Lincoln (SSBN-602)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Her keel was laid down by the Portsmouth Naval Shipyard of Kittery, Maine, on 1 November 1958. She was launched on 14 May 1960 sponsored by Mrs. Mary L. Beckwith, and commissioned on 8 March 1961 with Commander Leonard Erb commanding the Blue Crew and Commander Donald M. Miller commanding the Gold Crew.

AttributesValues
rdf:type
rdfs:label
  • USS Abraham Lincoln (SSBN-602)
rdfs:comment
  • Her keel was laid down by the Portsmouth Naval Shipyard of Kittery, Maine, on 1 November 1958. She was launched on 14 May 1960 sponsored by Mrs. Mary L. Beckwith, and commissioned on 8 March 1961 with Commander Leonard Erb commanding the Blue Crew and Commander Donald M. Miller commanding the Gold Crew.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship image
module
  • --07-30
abstract
  • Her keel was laid down by the Portsmouth Naval Shipyard of Kittery, Maine, on 1 November 1958. She was launched on 14 May 1960 sponsored by Mrs. Mary L. Beckwith, and commissioned on 8 March 1961 with Commander Leonard Erb commanding the Blue Crew and Commander Donald M. Miller commanding the Gold Crew.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software