About: Chairlift   Sponge Permalink

An Entity of Type : dbkwik:resource/wEV6XgyWVhvjYr6QJLB6_g==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Cars hang from a steel cable which runs continuously from one end of the chairlift to the other and around large turnaround wheels at each end.

AttributesValues
rdf:type
rdfs:label
  • Chairlift
rdfs:comment
  • Cars hang from a steel cable which runs continuously from one end of the chairlift to the other and around large turnaround wheels at each end.
  • Depending on carrier size and loading efficiency, a passenger ropeway can move up 4000 people per hour, and the fastest lifts achieve operating speeds of up to 12 meters/second (27 mph, 43 km/h). The two-person double chair, which for many years was the workhorse of the ski industry, can move roughly 1200 people per hour at rope speeds of up to 2.5 m/s. The four person detachable chairlift ("high-speed quad") can transport 2400 people per hour with an average rope speed of 5 m/s. Some bi and tri cable elevated-ropeways and reversible tramways achieve much greater operating speeds. Fixed-grip lifts are usually shorter than detachable-grip lifts due to rope load; the maximum vertical rise for a fixed grip chairlift is 300-400 meters and a length of about 1200 m, while detachable quads can se
sameAs
dcterms:subject
RCT
  • Chairlift
dbkwik:rct/property/wikiPageUsesTemplate
dbkwik:snow/proper...iPageUsesTemplate
descr
  • A station-to-station transport ride
  • with the highest max height of all the transports
Game
Type
  • Transport Ride
Cost
  • 1440(xsd:integer)
Size
  • Medium - Large
abstract
  • Depending on carrier size and loading efficiency, a passenger ropeway can move up 4000 people per hour, and the fastest lifts achieve operating speeds of up to 12 meters/second (27 mph, 43 km/h). The two-person double chair, which for many years was the workhorse of the ski industry, can move roughly 1200 people per hour at rope speeds of up to 2.5 m/s. The four person detachable chairlift ("high-speed quad") can transport 2400 people per hour with an average rope speed of 5 m/s. Some bi and tri cable elevated-ropeways and reversible tramways achieve much greater operating speeds. Fixed-grip lifts are usually shorter than detachable-grip lifts due to rope load; the maximum vertical rise for a fixed grip chairlift is 300-400 meters and a length of about 1200 m, while detachable quads can service a vertical rise of over 600 m and a line length of 2000 m.
  • Cars hang from a steel cable which runs continuously from one end of the chairlift to the other and around large turnaround wheels at each end.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software