abstract
| - The canal was founded by ThebesAndSound in December 2014 at 26537z with the original intention to build northwards and finish at spawn. Over 4 months and without a beacon Thebes completed the original section between 21.5k and 26.5k. In March 2015 Thebes contacted ChadDX who was known at the time for building at spawn. Thebes gave Chad full ownership for how the spawn end of the canal should look and where it should be. Chad decided it should be at 1200, on the outer most ring of the spawn ring roads he had built (400, 800 and 1200). Work was done by ChadDX, joshYarnspinner, Dic and rainyafternoon to complete the 1200 terminal, a short section of canal was made from stone brick loading south away from the terminal. Upon hearing news of the work happening at the spawn end, Thebes travelled to 1200 to meet who was there. This culminated in Thebes's abandonment of the original section to work with the group at spawn and build the canal southwards. This group of players eventually became known as South Canal Corp. The canal saw big changes due to the 1.9 Minecraft update. During the update, boats received optimisations that made traveling by boat much easier and smoother and so allowed players to travel at speed on the canal. Also along with 1.9, the enchantment Frost Walker became a problem as players would walk over the water and freeze large sections. Frost Walker damage is no longer an issue as Hausemaster re-enabled frosted ice melting during the Rusher War , in which the Southern Canal saw the most damage. During the Rusher War, the Southern Canal was a large hub for Rushers as they would use it to escape spawn as it was relatively close to spawn and the use of boats reduced hunger. Rushers, along with other griefers, also caused damage to several buildings along the canal. The two terminals at the start and end of the canal's were both griefed during the war. The top block of the canal walls were fully replaced by Obsidian in July 2017.
|