About: Totteridge and Whetstone tube station   Sponge Permalink

An Entity of Type : dbkwik:resource/ECOSrkzu2pwtEk9OZ4oF-w==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Totteridge and Whetstone station was planned by the Edgware, Highgate and London Railway (EH&LR) and was originally opened as Whetstone and Totteridge on 1 April 1872 by the Great Northern Railway (which had taken over the EH&LR). The station was on a branch of a line that ran from Finsbury Park to Edgware via Highgate.

AttributesValues
rdf:type
rdfs:label
  • Totteridge and Whetstone tube station
rdfs:comment
  • Totteridge and Whetstone station was planned by the Edgware, Highgate and London Railway (EH&LR) and was originally opened as Whetstone and Totteridge on 1 April 1872 by the Great Northern Railway (which had taken over the EH&LR). The station was on a branch of a line that ran from Finsbury Park to Edgware via Highgate.
image name
  • Totteridge & Whetstone stn building.JPG
dcterms:subject
dbkwik:uk-transpor...iPageUsesTemplate
dbkwik:uktransport...iPageUsesTemplate
Previous
  • High Barnet
Platforms
  • 2(xsd:integer)
fare zone
  • 4(xsd:integer)
Events
  • Opened
  • Ended
  • Started
Name
  • Totteridge and Whetstone
Locale
Type
  • South
  • High Barnet
Manager
borough
Line
  • Northern
System
  • LUL
Years
  • 1872(xsd:integer)
  • 1940(xsd:integer)
  • 1941(xsd:integer)
tubeexits
  • 1(xsd:double)
  • 1(xsd:double)
  • 1(xsd:double)
  • 1(xsd:double)
NEXT
  • Woodside Park
abstract
  • Totteridge and Whetstone station was planned by the Edgware, Highgate and London Railway (EH&LR) and was originally opened as Whetstone and Totteridge on 1 April 1872 by the Great Northern Railway (which had taken over the EH&LR). The station was on a branch of a line that ran from Finsbury Park to Edgware via Highgate. After the 1921 Railways Act created the Big Four railway companies the line was, from 1923, part of the London & North Eastern Railway (LNER). The section of the High Barnet branch north of East Finchley was incorporated into the London Underground network through the "Northern Heights" project begun in the late 1930s. High Barnet station was first served by Northern Line trains on 14 April 1940 and, after a period where the station was serviced by both operators, LNER services ended in 1941. The station still retains much of its original Victorian architectural character today.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software