About: London Underground sleet locomotives   Sponge Permalink

An Entity of Type : dbkwik:resource/tJoxRk4eUDXKJUY_5vwhWg==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Sleet locomotives were redundant London Underground cars converted to help with the removal of ice that built up on the conductor rails. The main batch of eighteen tube-gauge locomotives were built between 1938 and 1941 from motor cars originally built in 1903. They were refurbished in the 1960s using equipment removed from redundant T-stock vehicles, and were joined by a pair of surface-gauge locomotives in 1961. In addition to de-icing duties, some of them were also used for experiments in clearing leaves from the running rails. They had all ceased to operate by 1985. One of the tube-gauge locomotives subsequently went to the London Transport Museum, and the surface-gauge cars went to the Spa Valley Railway.

AttributesValues
rdf:type
rdfs:label
  • London Underground sleet locomotives
rdfs:comment
  • Sleet locomotives were redundant London Underground cars converted to help with the removal of ice that built up on the conductor rails. The main batch of eighteen tube-gauge locomotives were built between 1938 and 1941 from motor cars originally built in 1903. They were refurbished in the 1960s using equipment removed from redundant T-stock vehicles, and were joined by a pair of surface-gauge locomotives in 1961. In addition to de-icing duties, some of them were also used for experiments in clearing leaves from the running rails. They had all ceased to operate by 1985. One of the tube-gauge locomotives subsequently went to the London Transport Museum, and the surface-gauge cars went to the Spa Valley Railway.
sameAs
dcterms:subject
dbkwik:uk-transpor...iPageUsesTemplate
dbkwik:uktransport...iPageUsesTemplate
Name
  • London Underground sleet locomotives
abstract
  • Sleet locomotives were redundant London Underground cars converted to help with the removal of ice that built up on the conductor rails. The main batch of eighteen tube-gauge locomotives were built between 1938 and 1941 from motor cars originally built in 1903. They were refurbished in the 1960s using equipment removed from redundant T-stock vehicles, and were joined by a pair of surface-gauge locomotives in 1961. In addition to de-icing duties, some of them were also used for experiments in clearing leaves from the running rails. They had all ceased to operate by 1985. One of the tube-gauge locomotives subsequently went to the London Transport Museum, and the surface-gauge cars went to the Spa Valley Railway.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software