About: USS Wichita (AOR-1)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The second Wichita (AOR-1) was laid down on 16 June 1966 at Quincy, Massachusetts, by the General Dynamics Quincy Shipbuilding Division; launched on 16 March 1968; sponsored by Mrs. Howard B. Yeager; and commissioned on 7 June 1969, Captain Robert R. Deibler in command.

AttributesValues
rdf:type
rdfs:label
  • USS Wichita (AOR-1)
rdfs:comment
  • The second Wichita (AOR-1) was laid down on 16 June 1966 at Quincy, Massachusetts, by the General Dynamics Quincy Shipbuilding Division; launched on 16 March 1968; sponsored by Mrs. Howard B. Yeager; and commissioned on 7 June 1969, Captain Robert R. Deibler in command.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship image
  • 300(xsd:integer)
module
  • --06-02
abstract
  • The second Wichita (AOR-1) was laid down on 16 June 1966 at Quincy, Massachusetts, by the General Dynamics Quincy Shipbuilding Division; launched on 16 March 1968; sponsored by Mrs. Howard B. Yeager; and commissioned on 7 June 1969, Captain Robert R. Deibler in command.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software