The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio It was completed in 2009[7] and cost between $80 and 105 million to build. It replaced the demolished Toledo Sports Arena. The new arena is home of the Toledo Walleye ECHL ice hockey team beginning in the 2009–10 season Toledo Arena Sports, Inc., had been in discussions with the National Basketball Association to bring an NBA Development League team to the arena, but plans have been shelved for the moment due to scheduling conflicts with Walleye games. Toledo Arena Sports has not totally abandoned the idea and an NBA-D team could be developed in the future.

AttributesValues
rdf:type
rdfs:label
  • Huntington Center
rdfs:comment
  • The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio It was completed in 2009[7] and cost between $80 and 105 million to build. It replaced the demolished Toledo Sports Arena. The new arena is home of the Toledo Walleye ECHL ice hockey team beginning in the 2009–10 season Toledo Arena Sports, Inc., had been in discussions with the National Basketball Association to bring an NBA Development League team to the arena, but plans have been shelved for the moment due to scheduling conflicts with Walleye games. Toledo Arena Sports has not totally abandoned the idea and an NBA-D team could be developed in the future.
  • The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio It was completed in 2009 and cost between $80 and 105 million to build. it replaced the demolished Toledo Sports Arena. The new arena is home of the Toledo Walleye ECHL ice hockey team beginning in the 2009–10 season Toledo Arena Sports, Inc., had been in discussions with the National Basketball Association to bring an NBA Developmental League team to the arena, but have been shelved for the moment due to scheduling conflicts with Walleye games. Toledo Arena Sports has not totally abandoned the idea and an NBA-D team could be developed in the future.
Former names
  • Lucas County Arena
dcterms:subject
foaf:homepage
borderradius
  • 6(xsd:integer)
altbackcolor
  • #FFFFFF
dbkwik:icehockey/p...iPageUsesTemplate
dbkwik:prowrestlin...iPageUsesTemplate
BorderColor
  • silver
broke ground
  • 2007-10-01(xsd:date)
construction cost
  • 1.05E8
backcolor
  • #FFE93E
Height
  • 2(xsd:double)
stadium name
  • Huntington Center
maxwidth
  • 20(xsd:integer)
TAB
  • General
  • Image gallery
Surface
  • multi-surface
seating capacity
  • 8000(xsd:integer)
  • 8200(xsd:integer)
Opened
  • 2009-10-03(xsd:date)
  • Fall, 2009
Owner
  • Lucas County
tenants
  • Toledo Walleye
Location
  • 500(xsd:integer)
  • Toledo, OH
  • Toledo, OH 43604
abstract
  • The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio It was completed in 2009 and cost between $80 and 105 million to build. it replaced the demolished Toledo Sports Arena. The new arena is home of the Toledo Walleye ECHL ice hockey team beginning in the 2009–10 season Toledo Arena Sports, Inc., had been in discussions with the National Basketball Association to bring an NBA Developmental League team to the arena, but have been shelved for the moment due to scheduling conflicts with Walleye games. Toledo Arena Sports has not totally abandoned the idea and an NBA-D team could be developed in the future. After a successful partnership on the Mud Hens Stadium (Fifth Third Field), the Lucas County Commissioners again teamed with HNTB Architecture Inc., a national sports architecture firm located in Kansas City; The Collaborative Inc, of Toledo; and Poggemeyer Design Group, of Toledo. The arena is also looking to become the first new LEED sports arena in the United States. The arena's signature green design element is a 900-square foot "green wall" outside of the building, which will feature the use of plant life on the exterior of the building to help cool the arena by shading the glass-enclosed main entrance of the arena. The arena's location to mass transit systems, use of a light-colored roof membrane that reflects sunlight and underground cisterns collecting rain water to re-use for landscaping purposes around the arena, are also emphasized to acquire LEED points for the project. The arena is part of a complex that includes SeaGate Convention Centre and Fifth Third Field. Huntington Bancshares Incorporated bought the naming rights to Lucas County Arena in April 2010 and renamed the arena the Huntington Center. The six-year, $2.1 million naming rights and sponsorship agreement includes three renewal options of six years each, and could mean total Huntington payments of $11 million. The proceeds will go toward paying down the arena's $90 million debt.
  • The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio It was completed in 2009[7] and cost between $80 and 105 million to build. It replaced the demolished Toledo Sports Arena. The new arena is home of the Toledo Walleye ECHL ice hockey team beginning in the 2009–10 season Toledo Arena Sports, Inc., had been in discussions with the National Basketball Association to bring an NBA Development League team to the arena, but plans have been shelved for the moment due to scheduling conflicts with Walleye games. Toledo Arena Sports has not totally abandoned the idea and an NBA-D team could be developed in the future.
is Venue of
is Arena of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software