About: German submarine U-6 (1935)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

As she was one of the first batch of boats built following the renunciation of the Treaty of Versailles, she was capable of only coastal and short cruising work. This led to her being reassigned to training duties after the Norwegian campaign in 1940.

AttributesValues
rdf:type
rdfs:label
  • German submarine U-6 (1935)
rdfs:comment
  • As she was one of the first batch of boats built following the renunciation of the Treaty of Versailles, she was capable of only coastal and short cruising work. This led to her being reassigned to training duties after the Norwegian campaign in 1940.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
module
  • --02-02
abstract
  • As she was one of the first batch of boats built following the renunciation of the Treaty of Versailles, she was capable of only coastal and short cruising work. This led to her being reassigned to training duties after the Norwegian campaign in 1940. Built at Kiel in 1935, U-6 was a prestigious position for a captain in the German Navy during the years running up to the war, her commanders were all First World War veterans. However, once war began, it was painfully clear that U-6 and her sisters were not capable of competing with other nations' larger and faster boats, and so after an initial patrol in the Baltic Sea, U-6 was not deployed again until March 1940, when every ship available to the Kriegsmarine was sent to support the invasion of Norway. During the month-long campaign, U-6's sister boats suffered numerous losses, and gained a reputation as something of a liability, which led them to be withdrawn to a training squadron in the Baltic for the remainder of the war. In the Baltic, U-6 trained officer cadets in the skills needed to fight in the Battle of the Atlantic, some of her patrols even verged on Soviet territory following Operation Barbarossa, unlike some of her sister boats, U-6 never found a target on these missions. In the summer of 1944, with fuel and resources in short supply and the reputation of the Type II boats plummeting following a number of fatal accidents, U-6 was removed from service and laid up at Gotenhafen with a skeleton crew to perform maintenance. There she remained until May 1945, when a demolition team blew her up at her berth to prevent her falling into enemy hands.
is Unit of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software