The UPMC Sport Performance Complex was designed by the architectural firm L. D. Astorino Associates, Ltd. Development was managed by Oxford Development Company and construction of the complex by Mascaro Construction was initiated in June 1999 and completed on September 5, 2000 although the Panthers and Steelers moved into their respective portions of the facility in August. The complex was completed at a cost reported from $30 to $80 million and, as part of Pittsburgh’s urban river-front revitalization effort, is located on the former site of the Jones & Laughlin, and later LTV, steel mill in the SouthSide Works. The MRI room had to be encased in five layers of steel plate, plus a sixth layer of copper, in order to shield the MRI machines from the nearby CSX railroad tracks. Fill was also

AttributesValues
rdfs:label
  • UPMC Sports Performance Complex
rdfs:comment
  • The UPMC Sport Performance Complex was designed by the architectural firm L. D. Astorino Associates, Ltd. Development was managed by Oxford Development Company and construction of the complex by Mascaro Construction was initiated in June 1999 and completed on September 5, 2000 although the Panthers and Steelers moved into their respective portions of the facility in August. The complex was completed at a cost reported from $30 to $80 million and, as part of Pittsburgh’s urban river-front revitalization effort, is located on the former site of the Jones & Laughlin, and later LTV, steel mill in the SouthSide Works. The MRI room had to be encased in five layers of steel plate, plus a sixth layer of copper, in order to shield the MRI machines from the nearby CSX railroad tracks. Fill was also
dcterms:subject
dbkwik:americanfoo...iPageUsesTemplate
abstract
  • The UPMC Sport Performance Complex was designed by the architectural firm L. D. Astorino Associates, Ltd. Development was managed by Oxford Development Company and construction of the complex by Mascaro Construction was initiated in June 1999 and completed on September 5, 2000 although the Panthers and Steelers moved into their respective portions of the facility in August. The complex was completed at a cost reported from $30 to $80 million and, as part of Pittsburgh’s urban river-front revitalization effort, is located on the former site of the Jones & Laughlin, and later LTV, steel mill in the SouthSide Works. The MRI room had to be encased in five layers of steel plate, plus a sixth layer of copper, in order to shield the MRI machines from the nearby CSX railroad tracks. Fill was also brought in to raise the level of the land where the practice fields are by nine feet in order to keep them out of the flood plain.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software