About: USS Betelgeuse (AKA-11)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Betelgeuse was laid down as a C-2D on 9 March 1939 at Chester, Pennsylvania, by the Sun Shipbuilding & Drydock Co., Hull 180 under a Maritime Commission contract (MC hull 31); launched as Mormaclark on 18 September 1939; sponsored by Miss Anne Perry Woodward; delivered to the Moore McCormack Line, Inc., on 29 November 1939; acquired by the Navy on 29 May 1941; renamed Betelgeuse on 3 June 1941; converted for naval service by the Brewer Dry Dock Company, Staten Island, N.Y.; and commissioned as AK-28 on 14 June, Commander Harry D. Power in command.

AttributesValues
rdf:type
rdfs:label
  • USS Betelgeuse (AKA-11)
rdfs:comment
  • Betelgeuse was laid down as a C-2D on 9 March 1939 at Chester, Pennsylvania, by the Sun Shipbuilding & Drydock Co., Hull 180 under a Maritime Commission contract (MC hull 31); launched as Mormaclark on 18 September 1939; sponsored by Miss Anne Perry Woodward; delivered to the Moore McCormack Line, Inc., on 29 November 1939; acquired by the Navy on 29 May 1941; renamed Betelgeuse on 3 June 1941; converted for naval service by the Brewer Dry Dock Company, Staten Island, N.Y.; and commissioned as AK-28 on 14 June, Commander Harry D. Power in command.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • --06-08
Ship image
  • --06-08
module
  • --03-09
abstract
  • Betelgeuse was laid down as a C-2D on 9 March 1939 at Chester, Pennsylvania, by the Sun Shipbuilding & Drydock Co., Hull 180 under a Maritime Commission contract (MC hull 31); launched as Mormaclark on 18 September 1939; sponsored by Miss Anne Perry Woodward; delivered to the Moore McCormack Line, Inc., on 29 November 1939; acquired by the Navy on 29 May 1941; renamed Betelgeuse on 3 June 1941; converted for naval service by the Brewer Dry Dock Company, Staten Island, N.Y.; and commissioned as AK-28 on 14 June, Commander Harry D. Power in command. From her commissioning nearly through the fall of 1941, the cargo ship operated in the Atlantic conducting amphibious maneuvers off North Carolina in June and July, performing similar evolutions off Virginia in September, and carrying cargo to Bermuda and various ports in the West Indies during October. She then entered the Charleston Navy Yard for an overhaul and was there when the Japanese attacked Pearl Harbor on 7 December.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software