About: Soviet submarine K-320   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The nuclear-powered Charlie-I Soviet submarine K-320 had a reactor accident prior to commissioning while under construction. The event occurred on January 18, 1970. The submarine was repaired, commissioned on September 15, 1971, and was stricken in 1994.

AttributesValues
rdf:type
rdfs:label
  • Soviet submarine K-320
rdfs:comment
  • The nuclear-powered Charlie-I Soviet submarine K-320 had a reactor accident prior to commissioning while under construction. The event occurred on January 18, 1970. The submarine was repaired, commissioned on September 15, 1971, and was stricken in 1994.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
module
  • --09-15
abstract
  • The nuclear-powered Charlie-I Soviet submarine K-320 had a reactor accident prior to commissioning while under construction. The event occurred on January 18, 1970. The submarine was repaired, commissioned on September 15, 1971, and was stricken in 1994.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software