The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Geothermal Plant
- Geothermal plant
|
rdfs:comment
| - The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
- A Geothermal Plant is an infrastructure building in Tropico 5. Geothermal plant do not require roads and effectively obsoletes Fossil-Fuel Power Plant, Tidal Power Plant and Nuclear Power Plant in terms of power production efficiency, employment, economy and environmental variances. On average budget, a single Geothermal Plants' base power production is equivalent to two Fossil-Fuel Plants (or four Tidal Plants) on maximum budget. Four upgraded maximum budget Geothermal Plants, when place on volcanic tile, can outproduce a single on maximum budget Nuclear Plant at half the operational costs of importing cost-prohibitive Uranium.
- Geothermal Plant is the first solo campaign level in Tom Clancy's Splinter Cell: Double Agent (Version 1). Splinter Cell agent Sam Fisher and rookie Splinter Cell agent John Hodge must infiltrate a Geothermal Plant in Iceland to investigate suspicious activity. This mission is notable in that it is the last 'official mission' Sam Fisher participated in as a Splinter Cell agent for Third Echelon, before doing double agent missions for the NSA during the JBA Crisis in 2008.
|
Era
| |
dcterms:subject
| |
Row 9 info
| |
Row 8 info
| |
Row 4 info
| |
Row 10 title
| |
Row 7 title
| |
Row 1 info
| |
Row 8 title
| |
Row 4 title
| |
Row 9 title
| |
Row 2 info
| |
Row 6 info
| |
Row 1 title
| |
Row 5 info
| |
Row 2 title
| |
Row 6 title
| |
Row 10 info
| |
Row 5 title
| |
Row 3 info
| |
Row 3 title
| |
Row 7 info
| |
dbkwik:starwars/pr...iPageUsesTemplate
| |
dbkwik:tropico/pro...iPageUsesTemplate
| |
Box Title
| |
Date
| |
Affiliation
| |
Game
| - Splinter Cell: Double Agent
|
Name
| |
Image size
| |
dbkwik:splintercel...iPageUsesTemplate
| |
PREV
| |
Image File
| - Geothermal_Power_Plant.png
|
NEXT
| |
Objective
| - Investigate suspicious activities at the geothermal plant.
|
Location
| |
abstract
| - The Geothermal Plant was a part of the Republic detention facility located in the Maximum Security Section of the Belsavis prison.
- A Geothermal Plant is an infrastructure building in Tropico 5. Geothermal plant do not require roads and effectively obsoletes Fossil-Fuel Power Plant, Tidal Power Plant and Nuclear Power Plant in terms of power production efficiency, employment, economy and environmental variances. On average budget, a single Geothermal Plants' base power production is equivalent to two Fossil-Fuel Plants (or four Tidal Plants) on maximum budget. Four upgraded maximum budget Geothermal Plants, when place on volcanic tile, can outproduce a single on maximum budget Nuclear Plant at half the operational costs of importing cost-prohibitive Uranium.
- Geothermal Plant is the first solo campaign level in Tom Clancy's Splinter Cell: Double Agent (Version 1). Splinter Cell agent Sam Fisher and rookie Splinter Cell agent John Hodge must infiltrate a Geothermal Plant in Iceland to investigate suspicious activity. This mission is notable in that it is the last 'official mission' Sam Fisher participated in as a Splinter Cell agent for Third Echelon, before doing double agent missions for the NSA during the JBA Crisis in 2008.
|
is PREV
of | |
is NEXT
of | |