About: Disaster On Allington Bridge   Sponge Permalink

An Entity of Type : owl:Thing, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The load is well within the overall capacity of the bridge, but not as a concentrated mass, and as the M.S.P slowly travels over the bridge the suspension cables begin to snap and the bridge collapses, tipping the M.S.P from the transporter into the Allington River. The rocket lands on the river bed in an upright launch position, but covered in debris from the bridge. The impact sets off the automatic launch countdown, which will blow the rocket to pieces, killing two Astronauts who are trapped in the command module. DD301.png|The M.S.P approach the bridge. DD302.png|Police escort. DD303.png|Slowly forward. DD305.png|Bridge staff audience. DD311.png|The M.S.P reach the center of the bridge. DD319.png|The suspension cables start to snap. DD322.png|The Bridge starts to give way. DD324.png|T

AttributesValues
rdfs:label
  • Disaster On Allington Bridge
rdfs:comment
  • The load is well within the overall capacity of the bridge, but not as a concentrated mass, and as the M.S.P slowly travels over the bridge the suspension cables begin to snap and the bridge collapses, tipping the M.S.P from the transporter into the Allington River. The rocket lands on the river bed in an upright launch position, but covered in debris from the bridge. The impact sets off the automatic launch countdown, which will blow the rocket to pieces, killing two Astronauts who are trapped in the command module. DD301.png|The M.S.P approach the bridge. DD302.png|Police escort. DD303.png|Slowly forward. DD305.png|Bridge staff audience. DD311.png|The M.S.P reach the center of the bridge. DD319.png|The suspension cables start to snap. DD322.png|The Bridge starts to give way. DD324.png|T
dcterms:subject
abstract
  • The load is well within the overall capacity of the bridge, but not as a concentrated mass, and as the M.S.P slowly travels over the bridge the suspension cables begin to snap and the bridge collapses, tipping the M.S.P from the transporter into the Allington River. The rocket lands on the river bed in an upright launch position, but covered in debris from the bridge. The impact sets off the automatic launch countdown, which will blow the rocket to pieces, killing two Astronauts who are trapped in the command module. DD301.png|The M.S.P approach the bridge. DD302.png|Police escort. DD303.png|Slowly forward. DD305.png|Bridge staff audience. DD311.png|The M.S.P reach the center of the bridge. DD319.png|The suspension cables start to snap. DD322.png|The Bridge starts to give way. DD324.png|The supports start to crumble. DD325.png|A worried looking crew. DD326.png|The bridge gives way. DD327.png|The supports collapse. DD328.png|The M.S.P tips over. DD330.png|Sinking! DD332.png|The M.S.P hits the river bed. DD333.png|Automatic countdown starts. DD336.png|Covered in debris.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software