Time in the Future AoM is measured from the Future Timeline (FT). Years prior to this are referred to as Before the Future Timeline or BFT and years after as After the Future Timeline or AFT.
Attributes | Values |
---|---|
rdfs:label |
|
rdfs:comment |
|
dcterms:subject | |
abstract |
|