About: USS Flasher (SSN-613)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 9 June 1960 and her keel was laid down on 14 April 1961. Originally laid down as the eleventh submarine in the Thresher-class building program, Flasher was extensively modified during the construction period. These modifications consisted of lengthening the hull, lengthening the sail, and upgrading the watertight integrity of the sea water systems. The SUBSAFE Program was developed as a result of the loss of the Thresher (SSN-593), the first submarine of the class; Flasher became the first submarine certified as SUBSAFE. This contributed to the lengthy delay between being laid down and commissioning.

AttributesValues
rdf:type
rdfs:label
  • USS Flasher (SSN-613)
rdfs:comment
  • The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 9 June 1960 and her keel was laid down on 14 April 1961. Originally laid down as the eleventh submarine in the Thresher-class building program, Flasher was extensively modified during the construction period. These modifications consisted of lengthening the hull, lengthening the sail, and upgrading the watertight integrity of the sea water systems. The SUBSAFE Program was developed as a result of the loss of the Thresher (SSN-593), the first submarine of the class; Flasher became the first submarine certified as SUBSAFE. This contributed to the lengthy delay between being laid down and commissioning.
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • Flasher underway outside San Francisco Bay
Ship image
  • 300(xsd:integer)
module
  • --06-09
abstract
  • The contract to build her was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut on 9 June 1960 and her keel was laid down on 14 April 1961. Originally laid down as the eleventh submarine in the Thresher-class building program, Flasher was extensively modified during the construction period. These modifications consisted of lengthening the hull, lengthening the sail, and upgrading the watertight integrity of the sea water systems. The SUBSAFE Program was developed as a result of the loss of the Thresher (SSN-593), the first submarine of the class; Flasher became the first submarine certified as SUBSAFE. This contributed to the lengthy delay between being laid down and commissioning. In the nation's only simultaneous twin launching Flasher and Tecumseh (SSBN-628) were launched on 22 June 1963. Flasher was sponsored and christened by Mrs. Paul F. Fay, Jr., wife of the Under Secretary of the Navy. Vice Admiral Elton W. Grenfell, then Commander Submarine Force, U.S. Atlantic Fleet (ComSubLant), delivered the principal address. She was commissioned on 22 July 1966, with Commander Kenneth M. Carr in command. The principal speaker at the commissioning was US Representative George W. Grider of Tennessee, who had commanded the Flasher (SS-249) during World War II.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software