About: USS Pathfinder (AGS-1)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Pathfinder was built by the Lake Washington Shipyard of Houghton, Washington with her keel laid 20 February 1941, christened by Eleanor Roosevelt Boettinger, grand-daughter of the president, launched 11 January 1942 and completed 31 August 1942 with armament as a request by Navy as the ship's transfer had been approved by Department of Commerce before completion. The ship had been completed at a cost of $1,265,448 which was slightly under estimated costs. She was acquired by the U.S. Navy and commissioned 31 August 1942, with Capt. Bascom H. Thomas, USNR, in command.

AttributesValues
rdf:type
rdfs:label
  • USS Pathfinder (AGS-1)
rdfs:comment
  • Pathfinder was built by the Lake Washington Shipyard of Houghton, Washington with her keel laid 20 February 1941, christened by Eleanor Roosevelt Boettinger, grand-daughter of the president, launched 11 January 1942 and completed 31 August 1942 with armament as a request by Navy as the ship's transfer had been approved by Department of Commerce before completion. The ship had been completed at a cost of $1,265,448 which was slightly under estimated costs. She was acquired by the U.S. Navy and commissioned 31 August 1942, with Capt. Bascom H. Thomas, USNR, in command.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • USC&GS Pathfinder was commissionerd as a U.S. Navy vessel during World War II.
Ship image
  • 300(xsd:integer)
module
  • --02-20
abstract
  • Pathfinder was built by the Lake Washington Shipyard of Houghton, Washington with her keel laid 20 February 1941, christened by Eleanor Roosevelt Boettinger, grand-daughter of the president, launched 11 January 1942 and completed 31 August 1942 with armament as a request by Navy as the ship's transfer had been approved by Department of Commerce before completion. The ship had been completed at a cost of $1,265,448 which was slightly under estimated costs. She was acquired by the U.S. Navy and commissioned 31 August 1942, with Capt. Bascom H. Thomas, USNR, in command.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software