The estate began to suffer from severe social problems from the outset and in 1992, an Estate Action Plan to regenerate the estate was approved. In 1995, proposals to demolished all but one of the tower blocks were approved, meaning that Hawke Tower would be retained and was then later refurbished. The tower was repainted and clad in brick for the lower part of the structure. A new curved roof was installed on the top of the building.
Attributes | Values |
---|---|
rdfs:label |
|
rdfs:comment |
|
dcterms:subject | |
abstract |
|