About: Wolei-class minelayer   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The Type 918 Wolei class minelayer is the sole minelayer in the People's Liberation Army Navy, numbered 814. The ship was designed by the 708 Institute in 1981, with Mr. Ma Jinghua (馬錦華) as the general designer. All of the onboard subsystems were completed in 1984. Dalian Shipyard begin construction of the ship in 1984 and completed it in 1988. Although successful, no more minelayers of this type were ordered because most other naval vessels in the PLAN inventory were also capable of laying mines. This class, however, does have advantage over other platforms in that it can lay conformal mines, i.e. mines with irregular shapes instead of the ordinary cylindrical and spherical shapes, and conformal mines are much harder to detect and identify. The mine laying process is fully computerized an

AttributesValues
rdf:type
rdfs:label
  • Wolei-class minelayer
rdfs:comment
  • The Type 918 Wolei class minelayer is the sole minelayer in the People's Liberation Army Navy, numbered 814. The ship was designed by the 708 Institute in 1981, with Mr. Ma Jinghua (馬錦華) as the general designer. All of the onboard subsystems were completed in 1984. Dalian Shipyard begin construction of the ship in 1984 and completed it in 1988. Although successful, no more minelayers of this type were ordered because most other naval vessels in the PLAN inventory were also capable of laying mines. This class, however, does have advantage over other platforms in that it can lay conformal mines, i.e. mines with irregular shapes instead of the ordinary cylindrical and spherical shapes, and conformal mines are much harder to detect and identify. The mine laying process is fully computerized an
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
abstract
  • The Type 918 Wolei class minelayer is the sole minelayer in the People's Liberation Army Navy, numbered 814. The ship was designed by the 708 Institute in 1981, with Mr. Ma Jinghua (馬錦華) as the general designer. All of the onboard subsystems were completed in 1984. Dalian Shipyard begin construction of the ship in 1984 and completed it in 1988. Although successful, no more minelayers of this type were ordered because most other naval vessels in the PLAN inventory were also capable of laying mines. This class, however, does have advantage over other platforms in that it can lay conformal mines, i.e. mines with irregular shapes instead of the ordinary cylindrical and spherical shapes, and conformal mines are much harder to detect and identify. The mine laying process is fully computerized and both the hardware and software have been upgraded to accommodate new weapons and tactics. In addition to laying mines, the ship is also extensively equipped for use as a supply ship, and has been deployed in supply missions much more frequently than as a minelayer.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software