About: Costello Tower   Sponge Permalink

An Entity of Type : owl:Thing, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The General Contractors began the construction of Costello Towers in December of 2011 and the building was finished by July of 2012 after long delays. Costello had originally wanted it to become the tallest building in Lovia, which it was well-within his means to do, however, he compromised on its size for political reasons.

AttributesValues
rdfs:label
  • Costello Tower
rdfs:comment
  • The General Contractors began the construction of Costello Towers in December of 2011 and the building was finished by July of 2012 after long delays. Costello had originally wanted it to become the tallest building in Lovia, which it was well-within his means to do, however, he compromised on its size for political reasons.
dcterms:subject
dbkwik:nation/prop...iPageUsesTemplate
abstract
  • The General Contractors began the construction of Costello Towers in December of 2011 and the building was finished by July of 2012 after long delays. Costello had originally wanted it to become the tallest building in Lovia, which it was well-within his means to do, however, he compromised on its size for political reasons.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software