The James Webb Space Telescope (JWST), previously known as Next Generation Space Telescope (NGST), is a major space observatory under construction and scheduled to launch in October 2018. The JWST will offer unprecedented resolution and sensitivity from long-wavelength (orange-red) visible light, through near-infrared to the mid-infrared (0.6 to 27 micrometers), and is a successor instrument to the Hubble Space Telescope and the Spitzer Space Telescope. While Hubble has a -meter () mirror, the JWST features a larger and segmented 6.5-meter (21 ft) diameter primary mirror and will be located near the Earth–Sun L2 point. A large sunshield will keep its mirror and four science instruments below K () .

AttributesValues
rdf:type
rdfs:label
  • James Webb Space Telescope
rdfs:comment
  • The James Webb Space Telescope (JWST), previously known as Next Generation Space Telescope (NGST), is a major space observatory under construction and scheduled to launch in October 2018. The JWST will offer unprecedented resolution and sensitivity from long-wavelength (orange-red) visible light, through near-infrared to the mid-infrared (0.6 to 27 micrometers), and is a successor instrument to the Hubble Space Telescope and the Spitzer Space Telescope. While Hubble has a -meter () mirror, the JWST features a larger and segmented 6.5-meter (21 ft) diameter primary mirror and will be located near the Earth–Sun L2 point. A large sunshield will keep its mirror and four science instruments below K () .
sameAs
label type
  • Year
dcterms:subject
dbkwik:nasa/proper...iPageUsesTemplate
width units
  • em
Label
  • 1997(xsd:integer)
  • 1998(xsd:integer)
  • 1999(xsd:integer)
  • 2000(xsd:integer)
  • 2002(xsd:integer)
  • 2003(xsd:integer)
  • 2005(xsd:integer)
  • 2006(xsd:integer)
  • 2008(xsd:integer)
  • 2010(xsd:integer)
  • 2011(xsd:integer)
  • 2013(xsd:integer)
Power
  • 2000(xsd:integer)
trans band
float
  • right
bar width
  • 20(xsd:integer)
Mission Duration
  • 3.15576E8
  • 1.57788E8
Name
  • James Webb Space Telescope
launch contractor
Align
  • right
Caption
  • Mirror segment after being coated with gold
  • Primary mirror segments made of beryllium
  • Mirror segments undergoing cryogenic tests at the X-ray & Cryogenic Facility at Marshall Space Flight Center
Width
  • 220(xsd:integer)
data type
  • Cost
Insignia
  • JWST_decal.svg
Image caption
  • Full scale James Webb Space Telescope model at South by Southwest in Austin
Title
  • Estimated total cost
Manufacturer
orbit period
  • 1.57788E7
Data
  • 0(xsd:double)
  • 1(xsd:integer)
  • 1(xsd:double)
  • 2(xsd:double)
  • 3(xsd:integer)
  • 4(xsd:double)
  • 5(xsd:double)
  • 6(xsd:double)
  • 8(xsd:double)
  • 8(xsd:double)
Image size
  • 380(xsd:integer)
Operator
  • NASAESACSASTScI
direction
  • vertical
telescope type
data max
  • 9(xsd:integer)
Image
  • James Webb Space Telescope Mirror33.jpg
  • James Webb Space Telescope Mirror37.jpg
  • James Webb Space Telescope Mirror38.jpg
launch site
names list
  • Next Generation Space Telescope
Mission Type
apsis
  • apsis
orbit regime
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software