About: Future of the French Navy   Sponge Permalink

An Entity of Type : owl:Thing, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The French Navy is undertaking a significant reinforcement, both in modernising and in number, under the Projet de loi de programmation militaire 2003–2008 ("Military programme law project 2003–2008"), which notably includes: The equipment will also be modernised, notably * New models of the successful Exocet missile * Aster and SYLVER systems for anti-missile/anti-air defence * Cruise missiles (the naval or submarine SCALP EG)

AttributesValues
rdfs:label
  • Future of the French Navy
rdfs:comment
  • The French Navy is undertaking a significant reinforcement, both in modernising and in number, under the Projet de loi de programmation militaire 2003–2008 ("Military programme law project 2003–2008"), which notably includes: The equipment will also be modernised, notably * New models of the successful Exocet missile * Aster and SYLVER systems for anti-missile/anti-air defence * Cruise missiles (the naval or submarine SCALP EG)
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
abstract
  • The French Navy is undertaking a significant reinforcement, both in modernising and in number, under the Projet de loi de programmation militaire 2003–2008 ("Military programme law project 2003–2008"), which notably includes: * Two Horizon class destroyers; both have been launched, one undertaking trials, and the other is being armed; the third one was canceled in 2007. * 11 FREMM multipurpose frigates – Eight ships have been ordered as part of the 2003–08 defence programming law and a further three are planned to be ordered. Two ships optimised for anti-aircraft warfare are being considered. Construction of the first ship in this class began in 2007 and she is scheduled to be commissioned in 2012. * Six nuclear attack submarines of the Barracuda class. The contract for the first three of these submarines was signed in 2006. The construction of the first boat in the class also began in 2006 and she is scheduled to be commissioned in 2017. The additional boats in the class will be built at the rate of one every 24 months, with the sixth submarine entering service in 2027. The equipment will also be modernised, notably * New models of the successful Exocet missile * Aster and SYLVER systems for anti-missile/anti-air defence * Cruise missiles (the naval or submarine SCALP EG)
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software