About: USS Paul G. Baker (DE-755)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The construction contract for Paul G. Baker was cancelled in 1944 before she could be completed. The incomplete ship was scrapped. The name Paul G. Baker was transferred to the destroyer escort USS Paul G. Baker (DE-642).

AttributesValues
rdf:type
rdfs:label
  • USS Paul G. Baker (DE-755)
rdfs:comment
  • The construction contract for Paul G. Baker was cancelled in 1944 before she could be completed. The incomplete ship was scrapped. The name Paul G. Baker was transferred to the destroyer escort USS Paul G. Baker (DE-642).
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
abstract
  • The construction contract for Paul G. Baker was cancelled in 1944 before she could be completed. The incomplete ship was scrapped. The name Paul G. Baker was transferred to the destroyer escort USS Paul G. Baker (DE-642).
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software