Metrolink is operated under a management contract by Stagecoach Group, on behalf of the system’s owner, the GMPTE. The Metrolink network is approximately long, with 37 stops along the route. Because much of the Metrolink route was formerly main-line railway with platforms about 900 mm above ground level, the new stops in the city centre also have 900 mm-high platforms.
Attributes | Values |
---|---|
rdfs:label |
|
rdfs:comment |
|
dcterms:subject | |
abstract |
|