About: USS Spitfire (1776)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Late in 1775, the $3 ordered the construction of two galleys, Washington and Spitfire. In January 1776, the General Assembly appointed John Grimes Commodore of the galleys and, presumably soon thereafter, they were placed in service in Narragansett Bay.

AttributesValues
rdf:type
rdfs:label
  • USS Spitfire (1776)
rdfs:comment
  • Late in 1775, the $3 ordered the construction of two galleys, Washington and Spitfire. In January 1776, the General Assembly appointed John Grimes Commodore of the galleys and, presumably soon thereafter, they were placed in service in Narragansett Bay.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
abstract
  • Late in 1775, the $3 ordered the construction of two galleys, Washington and Spitfire. In January 1776, the General Assembly appointed John Grimes Commodore of the galleys and, presumably soon thereafter, they were placed in service in Narragansett Bay.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software