About: USS Barbican (ACM-5)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

USS Barbican (ACM-5) was a Chimo-class minelayer in the United States Navy. Barbican was constructed as the Army Mine planter USAMP Col. George Armistead (MP-3) by the Marietta Manufacturing Co. at Point Pleasant, West Virginia and delivered to the U.S. Army in December 1942. The ship was acquired by the U.S. Navy from the Army Coast Artillery at Charleston, South Carolina, on 6 January 1945; renamed Barbican and designated an auxiliary minelayer, ACM-5, on 19 January 1945; converted for naval service by the Charleston Navy Yard; and placed in commission there on 24 March 1945, Lt. Comdr. Alexander Anderson, Jr., in command.

AttributesValues
rdf:type
rdfs:label
  • USS Barbican (ACM-5)
rdfs:comment
  • USS Barbican (ACM-5) was a Chimo-class minelayer in the United States Navy. Barbican was constructed as the Army Mine planter USAMP Col. George Armistead (MP-3) by the Marietta Manufacturing Co. at Point Pleasant, West Virginia and delivered to the U.S. Army in December 1942. The ship was acquired by the U.S. Navy from the Army Coast Artillery at Charleston, South Carolina, on 6 January 1945; renamed Barbican and designated an auxiliary minelayer, ACM-5, on 19 January 1945; converted for naval service by the Charleston Navy Yard; and placed in commission there on 24 March 1945, Lt. Comdr. Alexander Anderson, Jr., in command.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
module
  • --01-06
abstract
  • USS Barbican (ACM-5) was a Chimo-class minelayer in the United States Navy. Barbican was constructed as the Army Mine planter USAMP Col. George Armistead (MP-3) by the Marietta Manufacturing Co. at Point Pleasant, West Virginia and delivered to the U.S. Army in December 1942. The ship was acquired by the U.S. Navy from the Army Coast Artillery at Charleston, South Carolina, on 6 January 1945; renamed Barbican and designated an auxiliary minelayer, ACM-5, on 19 January 1945; converted for naval service by the Charleston Navy Yard; and placed in commission there on 24 March 1945, Lt. Comdr. Alexander Anderson, Jr., in command.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software