About: STS-119   Sponge Permalink

An Entity of Type : dbkwik:resource/G7YR4yAvfoe7I_ap4nmguQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

STS-119 (ISS assembly flight 15A) was a space shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station. The launch took place on 15 March 2009, at 19:43 EDT. Discovery successfully landed on 28 March 2009, at 15:13 pm EDT.

  • First
  • AttributesValues
    rdf:type
    rdfs:label
    • STS-119
    rdfs:comment
    • STS-119 (ISS assembly flight 15A) was a space shuttle mission to the International Space Station (ISS) which was flown by Space Shuttle Discovery during March 2009. It delivered and assembled the fourth starboard Integrated Truss Segment (S6), and the fourth set of solar arrays and batteries to the station. The launch took place on 15 March 2009, at 19:43 EDT. Discovery successfully landed on 28 March 2009, at 15:13 pm EDT.
    sameAs
    details7 down
    • ISS Flight Engineer
    flights7 down
    • Second
    COSPAR ID
    • 2009(xsd:integer)
    details5 down
    • ISS Commander
    dcterms:subject
    dbkwik:nasa/proper...iPageUsesTemplate
    crew6 up
    Reason
    • technical
    agency7 up
    crew4 up
    expedition7 down
    Previous Mission
    Date
    • 2009-03-11(xsd:date)
    • 2009-03-15(xsd:date)
    crew size
    • 7(xsd:integer)
    crew7 down
    landing date
    • --03-28
    crew landing
    flights1 up
    • Second
    agency7 down
    SATCAT
    • 34541(xsd:integer)
    Mission Duration
    • 1106973.0
    expedition5 up
    crew photo caption
    • Front row Antonelli, Archambault. Back row Acaba, Phillips, Swanson, Arnold and Wakata.
    details6 down
    • ISS Flight Engineer
    crew7 up
    Name
    • STS-119
    expedition7 up
    details5 up
    • ISS Commander
    expedition5 down
    crew1 up
    expedition6 down
    crew3 up
    terminology
    • Astronaut
    Insignia
    • STS-119 Patch.svg
    Image caption
    • Backdropped by the Earth, Discovery's approach to the station was photographed by Expedition 18 crewmembers
    crew photo
    • Sts119 crew portrait.jpg
    crew5 down
    orbit period
    • 5496.0
    crew6 down
    orbit inclination
    • 51(xsd:double)
    crew2 up
    docking
    • --03-17
    agency5 up
    Operator
    details7 up
    • ISS Flight Engineer
    crew launching
    DF
    • yes
    Result
    • scrubbed
    • successful
    flights3 up
    • First
    launch site
    Notes
    • leak in a liquid hydrogen vent line
    crew5 up
    Mission Type
    • ISS assembly
    landing site
    apsis
    • gee
    orbit regime
    Programme
    Launch date
    • --03-15
    flights4 up
    • Second
    flights7 up
    • Third
    crew members
    Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
    This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
    OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
    Data on this page belongs to its respective rights holders.
    Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software