About: AMDR   Sponge Permalink

An Entity of Type : owl:Thing, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

On October 10, 2013, "Raytheon Company (RTN) [was] awarded a $385,742,176 cost-plus-incentive-fee contract for the engineering and modeling development phase design, development, integration, test and delivery of Air and Missile Defense S-Band Radar (AMDR-S) and Radar Suite Controller (RSC)." In September 2010, the Navy awarded technology development contracts to Northrop Grumman, Lockheed Martin, and Raytheon to develop the S-band radar and radar suite controller (RSC). X-band radar development reportedly will come under separate contracts. The Navy hopes to place AMDR on Flight III Arleigh Burke class destroyer, possibly beginning in 2016. Those ships currently mount the Aegis Combat System system, produced by Lockheed Martin.

AttributesValues
rdfs:label
  • AMDR
rdfs:comment
  • On October 10, 2013, "Raytheon Company (RTN) [was] awarded a $385,742,176 cost-plus-incentive-fee contract for the engineering and modeling development phase design, development, integration, test and delivery of Air and Missile Defense S-Band Radar (AMDR-S) and Radar Suite Controller (RSC)." In September 2010, the Navy awarded technology development contracts to Northrop Grumman, Lockheed Martin, and Raytheon to develop the S-band radar and radar suite controller (RSC). X-band radar development reportedly will come under separate contracts. The Navy hopes to place AMDR on Flight III Arleigh Burke class destroyer, possibly beginning in 2016. Those ships currently mount the Aegis Combat System system, produced by Lockheed Martin.
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
abstract
  • On October 10, 2013, "Raytheon Company (RTN) [was] awarded a $385,742,176 cost-plus-incentive-fee contract for the engineering and modeling development phase design, development, integration, test and delivery of Air and Missile Defense S-Band Radar (AMDR-S) and Radar Suite Controller (RSC)." In September 2010, the Navy awarded technology development contracts to Northrop Grumman, Lockheed Martin, and Raytheon to develop the S-band radar and radar suite controller (RSC). X-band radar development reportedly will come under separate contracts. The Navy hopes to place AMDR on Flight III Arleigh Burke class destroyer, possibly beginning in 2016. Those ships currently mount the Aegis Combat System system, produced by Lockheed Martin. In 2013, the Navy cut almost $10 billion from the cost of the program by adopting a smaller less capable system that will be challenged by "future threats". the program is expected to deliver 22 radars at a total cost of $6,598m; they will cost $300m/unit in serial production. Testing is planned for 2021 and Initial operating capability is planned for March 2023. The Navy then was forced to halt the contract in response to a challenge by Lockheed.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software