In 1989 the south tunnel was electrified and Platform 1 was extended as part of the East Coast electrification project to allow through electric trains from King's Cross in London to Glasgow Central, and from Edinburgh Waverley to the West Coast Main Line. In 2011 in conjunction with the Airdrie to Bathgate project the North Tunnel was also electrified.