The objectives of the Picc-Vic tunnel were threefold: 1. * To improve the distribution arrangements from the existing railway stations which are on the periphery of the central core 2. * To link the separated northern and southern railway systems 3. * To improve passenger movement within the central area. It formed part of a four-phase, Long Term Strategy for GMPTE over 25 years, which included bus priority, an East-West railway network, as well as a light rapid transport system.
| Attributes | Values |
|---|---|
| rdf:type | |
| rdfs:label |
|
| rdfs:comment |
|
| sameAs | |
| dcterms:subject | |
| dbkwik:uk-transpor...iPageUsesTemplate | |
| dbkwik:uktransport...iPageUsesTemplate | |
| map state |
|
| End | |
| stations |
|
| Open |
|
| Status |
|
| Logo |
|
| Name |
|
| Locale | |
| Type | |
| Caption |
|
| System | |
| Start | |
| logo width |
|
| Routes |
|
| Image width |
|
| Elevation |
|
| abstract |
|