About: STS-113   Sponge Permalink

An Entity of Type : dbkwik:resource/G7YR4yAvfoe7I_ap4nmguQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

STS-113 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. During the 14-day mission in late 2002, Endeavour and its crew extended the ISS backbone with the P1 truss and exchanged the Expedition 5 and Expedition 6 crews aboard the station. With Commander Jim Wetherbee and Pilot Paul Lockhart at the controls, Endeavour docked with the station on 25 November 2002 to begin seven days of station assembly, spacewalks and crew and equipment transfers. This was Endeavour’s last flight before entering its Orbiter Major Modification period until 2007, and also the last shuttle mission before the Columbia disaster.

AttributesValues
rdf:type
rdfs:label
  • STS-113
rdfs:comment
  • STS-113 was a Space Shuttle mission to the International Space Station (ISS) flown by Space Shuttle Endeavour. During the 14-day mission in late 2002, Endeavour and its crew extended the ISS backbone with the P1 truss and exchanged the Expedition 5 and Expedition 6 crews aboard the station. With Commander Jim Wetherbee and Pilot Paul Lockhart at the controls, Endeavour docked with the station on 25 November 2002 to begin seven days of station assembly, spacewalks and crew and equipment transfers. This was Endeavour’s last flight before entering its Orbiter Major Modification period until 2007, and also the last shuttle mission before the Columbia disaster.
sameAs
decision date
  • 2002-11-10(xsd:date)
  • 2002-11-22(xsd:date)
details7 down
  • ISS Flight Engineer
flights7 down
  • Only
COSPAR ID
  • 2002(xsd:integer)
details5 down
  • ISS Commander/Soyuz Commander
dcterms:subject
dbkwik:nasa/proper...iPageUsesTemplate
colwidth
  • 175(xsd:integer)
crew6 up
Reason
  • technical
  • weather
crew4 up
expedition7 down
Previous Mission
Date
  • 2002-11-11(xsd:date)
  • 2002-11-22(xsd:date)
  • 2002-11-23(xsd:date)
crew size
  • 7(xsd:integer)
crew7 down
landing date
  • --12-07
crew landing
flights1 up
  • Sixth
agency7 down
SATCAT
  • 27556(xsd:integer)
Mission Duration
  • 1190918.0
expedition5 up
crew photo caption
  • : Paul S. Lockhart, Michael E. López-Alegría, John B. Herrington, and James D. Wetherbee
details6 down
  • ISS Flight Engineer
crew7 up
Name
  • STS-113
expedition7 up
agency5 down
weathergo
  • 90.0
  • 95.0
details5 up
  • ISS Commander
expedition5 down
crew1 up
expedition6 down
crew3 up
terminology
  • Astronaut
Insignia
  • STS-113 Patch.svg
Image caption
  • Endeavour carrying the P1 Truss
crew photo
  • STS-113 crew.jpg
crew5 down
orbit period
  • 5538.0
crew6 down
flights5 down
  • Second and last
orbit inclination
  • 51(xsd:double)
crew2 up
docking
  • --11-25
Operator
details7 up
  • ISS Flight Engineer
crew launching
Result
  • scrubbed
  • success
agency6 up
flights3 up
  • Third
launch site
Notes
  • weather at TAL sites Zaragoza and Moron, Spain
  • problems with an oxygen system in the orbiter's midbody
  • initial weather reports for TAL sites was not favorable but cleared in time for launch.
crew5 up
Mission Type
  • ISS assembly
  • Crew rotation
flights2 up
  • Second
landing site
apsis
  • gee
flights6 down
  • First
orbit regime
Programme
Launch date
  • --11-23
flights4 up
  • First
flights7 up
  • First
crew members
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software