About: STS-41-B   Sponge Permalink

An Entity of Type : dbkwik:resource/G7YR4yAvfoe7I_ap4nmguQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

STS-41-B was the tenth NASA Space Shuttle mission and the fourth flight of the Space Shuttle Challenger. It launched on February 3, 1984, and landed on February 11 after deploying two communications satellites. It was also notable for including the first untethered spacewalk. Following STS-9, the flight numbering system for the Space Shuttle program was changed. Thus, the next flight, instead of being designated STS-11, became STS-41-B; the original successor to STS-9, STS-10, was cancelled due to payload delays.

AttributesValues
rdf:type
rdfs:label
  • STS-41-B
rdfs:comment
  • STS-41-B was the tenth NASA Space Shuttle mission and the fourth flight of the Space Shuttle Challenger. It launched on February 3, 1984, and landed on February 11 after deploying two communications satellites. It was also notable for including the first untethered spacewalk. Following STS-9, the flight numbering system for the Space Shuttle program was changed. Thus, the next flight, instead of being designated STS-11, became STS-41-B; the original successor to STS-9, STS-10, was cancelled due to payload delays.
sameAs
COSPAR ID
  • 1984(xsd:integer)
dcterms:subject
dbkwik:nasa/proper...iPageUsesTemplate
crew EVA duration
  • 43920.0
  • 22620.0
  • 21300.0
crew4 up
Previous Mission
crew size
  • 5(xsd:integer)
landing date
  • --02-11
flights1 up
  • Third
SATCAT
  • 14681(xsd:integer)
Mission Duration
  • 688555.0
crew photo caption
  • L-R: Seated, Vance Brand, Commander, Robert Gibson, Pilot. Standing, L-R: Mission Specialists Robert L. Stewart, Ronald McNair and Bruce McCandless. Stewart and McCandless are wearing extravehicular mobility units .
Name
  • STS-41-B
crew1 up
crew3 up
terminology
  • Astronaut
Insignia
  • Sts-41-b-patch.png
Image caption
  • Bruce McCandless demonstrates the Manned Maneuvering Unit , floating in space above a clouded Earth.
crew photo
  • STS-41-B crew.jpg
orbit period
  • 5448.0
orbit inclination
  • 28(xsd:double)
crew2 up
Operator
flights3 up
  • First
crew EVAs
  • 2(xsd:integer)
launch site
crew5 up
Mission Type
  • Satellite deployment
  • Equipment testing
flights2 up
  • First
landing site
apsis
  • gee
orbit regime
Programme
Launch date
  • --02-03
flights4 up
  • First
crew members
Position
  • Pilot
  • Commander
  • Mission Specialist 1
  • Mission Specialist 2
  • Mission Specialist 3
orbits completed
  • 128(xsd:integer)
flights5 up
  • First
orbit epoch
  • 1984-02-05(xsd:date)
Next Mission
orbit reference
abstract
  • STS-41-B was the tenth NASA Space Shuttle mission and the fourth flight of the Space Shuttle Challenger. It launched on February 3, 1984, and landed on February 11 after deploying two communications satellites. It was also notable for including the first untethered spacewalk. Following STS-9, the flight numbering system for the Space Shuttle program was changed. Thus, the next flight, instead of being designated STS-11, became STS-41-B; the original successor to STS-9, STS-10, was cancelled due to payload delays.
is Previous Mission of
is Missions of
is Mission of
is Next Mission of
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software