About: ORP Orzeł (1986)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The boat was built by the Shipyard Krasnoe Sormovo in Gorky and was commissioned on 29 April 1986 at Riga. On 13 June of the same year Orzeł was transferred to Gdynia where was named on 21 June. The submarine was assigned to the 3rd Flotilla based in Gdynia.

AttributesValues
rdf:type
rdfs:label
  • ORP Orzeł (1986)
rdfs:comment
  • The boat was built by the Shipyard Krasnoe Sormovo in Gorky and was commissioned on 29 April 1986 at Riga. On 13 June of the same year Orzeł was transferred to Gdynia where was named on 21 June. The submarine was assigned to the 3rd Flotilla based in Gdynia.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • Orzeł in 2010
Ship image
  • 300(xsd:integer)
module
  • --04-29
abstract
  • The boat was built by the Shipyard Krasnoe Sormovo in Gorky and was commissioned on 29 April 1986 at Riga. On 13 June of the same year Orzeł was transferred to Gdynia where was named on 21 June. The submarine was assigned to the 3rd Flotilla based in Gdynia.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software