About: SM U-40 (Germany)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Her construction was ordered on 12 June 1912 and her keel was laid down on 3 April 1913 by Germaniawerft of Kiel. She was launched on 22 October 1914 and commissioned on 14 February 1915 under the command of Gerhardt Fürbringer. Second officer was lieutenant Rudolf Jauch (of the Jauch family). U-40 conducted one patrol, without sinking a ship.

AttributesValues
rdf:type
rdfs:label
  • SM U-40 (Germany)
rdfs:comment
  • Her construction was ordered on 12 June 1912 and her keel was laid down on 3 April 1913 by Germaniawerft of Kiel. She was launched on 22 October 1914 and commissioned on 14 February 1915 under the command of Gerhardt Fürbringer. Second officer was lieutenant Rudolf Jauch (of the Jauch family). U-40 conducted one patrol, without sinking a ship.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
module
  • --06-12
abstract
  • Her construction was ordered on 12 June 1912 and her keel was laid down on 3 April 1913 by Germaniawerft of Kiel. She was launched on 22 October 1914 and commissioned on 14 February 1915 under the command of Gerhardt Fürbringer. Second officer was lieutenant Rudolf Jauch (of the Jauch family). U-40 conducted one patrol, without sinking a ship.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software