Heathrow Connect is a train operating company in London provided jointly by Heathrow Express and First Great Western, connecting Heathrow Airport with Paddington Railway Station. The service follows the same route as the non-stop Heathrow Express service but calls at certain intermediate stations, connecting several locations in west London with each other, the airport, and Central London. It runs every half-hour throughout the day and evening. More information on the Wikipedia page [1]. The website is [2]
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - Heathrow Connect is a train operating company in London provided jointly by Heathrow Express and First Great Western, connecting Heathrow Airport with Paddington Railway Station. The service follows the same route as the non-stop Heathrow Express service but calls at certain intermediate stations, connecting several locations in west London with each other, the airport, and Central London. It runs every half-hour throughout the day and evening. More information on the Wikipedia page [1]. The website is [2]
- The service, launched on 12 June 2005, uses 5-coach Class 360/2 electric multiple-unit trains built by Siemens in Germany. These were originally built as Class 350's 4-coach units. Built by Siemens as Demonstrators to the UK and fitted with Gangway Cabs. When BAA bought these units, an extra coach was added to make them a 5-car unit. Heathrow Connect terminates at Heathrow Central station (Terminals 1 & 3) and a dedicated Heathrow Express Class 360/2 'Shuttle' now operates between Heathrow Central and Heathrow Terminal 4. Only Heathrow Express and London Underground services serve the new Heathrow Terminal 5 station.
|
sameAs
| |
dcterms:subject
| |
foaf:homepage
| |
dbkwik:uk-transpor...iPageUsesTemplate
| |
dbkwik:uktransport...iPageUsesTemplate
| |
stations
| |
widthpx
| |
nameforarea
| |
secregions
| |
Franchise
| - --06-12
- Not subject to franchising
|
Abbr
| |
Name
| |
image filename
| - HeathrowConnect 360205 Southall 20090513.JPG
|
Parent Company
| |
Regions
| |
BGCOLOR
| |
Website
| |
Fleet
| |
logo filename
| - Heathrow connect logo.PNG
|
abstract
| - Heathrow Connect is a train operating company in London provided jointly by Heathrow Express and First Great Western, connecting Heathrow Airport with Paddington Railway Station. The service follows the same route as the non-stop Heathrow Express service but calls at certain intermediate stations, connecting several locations in west London with each other, the airport, and Central London. It runs every half-hour throughout the day and evening. More information on the Wikipedia page [1]. The website is [2]
- The service, launched on 12 June 2005, uses 5-coach Class 360/2 electric multiple-unit trains built by Siemens in Germany. These were originally built as Class 350's 4-coach units. Built by Siemens as Demonstrators to the UK and fitted with Gangway Cabs. When BAA bought these units, an extra coach was added to make them a 5-car unit. Heathrow Connect terminates at Heathrow Central station (Terminals 1 & 3) and a dedicated Heathrow Express Class 360/2 'Shuttle' now operates between Heathrow Central and Heathrow Terminal 4. Only Heathrow Express and London Underground services serve the new Heathrow Terminal 5 station.
|
is Operator
of | |
is Route
of | |