The LED construction grid on the facade of the arena will be equipped with more than 300,000 LED clusters on a 12 m (39 ft) high and approximately 120 m (390 ft) wide section of the semicircular 105° glass facade with a total area of more than 1,440 m2 (15,500 sq ft). Light pixels, consisting of two groups of 19 LEDs (colour palette: 16.7 million RGB colours) will be attached to the vertical bracing of the facade. The vertical distances are 0.20 m (7.9 in) and the horizontal distances between the axes are planned to be 0.90 m (2 ft 11 in).
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - The LED construction grid on the facade of the arena will be equipped with more than 300,000 LED clusters on a 12 m (39 ft) high and approximately 120 m (390 ft) wide section of the semicircular 105° glass facade with a total area of more than 1,440 m2 (15,500 sq ft). Light pixels, consisting of two groups of 19 LEDs (colour palette: 16.7 million RGB colours) will be attached to the vertical bracing of the facade. The vertical distances are 0.20 m (7.9 in) and the horizontal distances between the axes are planned to be 0.90 m (2 ft 11 in).
|
sameAs
| |
Former names
| |
dcterms:subject
| |
dbkwik:football/pr...iPageUsesTemplate
| |
dbkwik:internation...iPageUsesTemplate
| |
broke ground
| |
construction cost
| |
Capacity
| - Basketball: 14,500
- Concerts/MMA: 17,000
- Ice hockey: 14,200
|
stadium name
| |
Operator
| |
Surface
| |
Architect
| |
Opened
| |
tenants
| |
Location
| - O2-Platz 1, Berlin, Germany
|
wikipage disambiguates
| |
abstract
| - The LED construction grid on the facade of the arena will be equipped with more than 300,000 LED clusters on a 12 m (39 ft) high and approximately 120 m (390 ft) wide section of the semicircular 105° glass facade with a total area of more than 1,440 m2 (15,500 sq ft). Light pixels, consisting of two groups of 19 LEDs (colour palette: 16.7 million RGB colours) will be attached to the vertical bracing of the facade. The vertical distances are 0.20 m (7.9 in) and the horizontal distances between the axes are planned to be 0.90 m (2 ft 11 in). In January 2015 German car manufacturer Mercedes-Benz announced it had reached a deal with the arena management to rename the venue Mercedes-Benz Arena Berlin starting 1 July 2015. According to Mercedes-Benz the naming deal will last 20 years, and will also include some changes to the arena's interior design. Between 2008 and 2015 the arena was known as O2 World Berlin due to sponsorship contract with Telefónica Germany, a telecommunications company.
|
is Ground
of | |
is Stadium
of | |