They were all demolished between February 2006 to July 2006 by Walter Forshaw Ltd. The contract value was £793,000. The demolition contractors were commissioned by Liverpool Housing Action Trust. The blocks were soft-stripped and subsequently demolished in their entirety using our Hitachi EX800 Super Reach demolition excavator fitted with a concrete pulverisor with 360o rotation. This form of demolition is known as high reach removal. The site was levelled and tracked over in preparation for the subsequent housing development.
| Attributes | Values |
|---|---|
| rdfs:label |
|
| rdfs:comment |
|
| dcterms:subject | |
| abstract |
|