About: USS Bluefish (SSN-675)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The contract to build Bluefish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 13 March 1968. She was launched on 10 January 1970, sponsored by Mrs. David Packard, and commissioned on 8 January 1971 with Commander Richard A. Peterson in command.

AttributesValues
rdf:type
rdfs:label
  • USS Bluefish (SSN-675)
rdfs:comment
  • The contract to build Bluefish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 13 March 1968. She was launched on 10 January 1970, sponsored by Mrs. David Packard, and commissioned on 8 January 1971 with Commander Richard A. Peterson in command.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • --02-01
Ship image
  • 300(xsd:integer)
module
  • --07-15
abstract
  • The contract to build Bluefish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 13 March 1968. She was launched on 10 January 1970, sponsored by Mrs. David Packard, and commissioned on 8 January 1971 with Commander Richard A. Peterson in command.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software