About: USS Revenge (AM-110)   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

Revenge was laid down as Right on 19 June 1942 by Winslow Marine Railway and Shipbuilding Company, Seattle, Washington; launched on 7 November 1942; renamed Revenge 15 May 1943; and commissioned on 21 July 1943, with Commander F. F. Sima in command.

AttributesValues
rdf:type
rdfs:label
  • USS Revenge (AM-110)
rdfs:comment
  • Revenge was laid down as Right on 19 June 1942 by Winslow Marine Railway and Shipbuilding Company, Seattle, Washington; launched on 7 November 1942; renamed Revenge 15 May 1943; and commissioned on 21 July 1943, with Commander F. F. Sima in command.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship image
  • 300(xsd:integer)
module
  • --02-14
  • --06-19
abstract
  • Revenge was laid down as Right on 19 June 1942 by Winslow Marine Railway and Shipbuilding Company, Seattle, Washington; launched on 7 November 1942; renamed Revenge 15 May 1943; and commissioned on 21 July 1943, with Commander F. F. Sima in command.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software