Production of a new 12-inch gun was behind schedule and the three battleships planned for the 1892 Naval Programme that were intended to use the new gun had to be delayed. In their stead, an improved Centurion-class battleship design was chosen to keep the workers at Pembroke Dockyard fully employed. No formal requirement for a second-class battleship suitable for use as the flagship on foreign stations or to reinforce cruiser squadrons existed at the time, but the decision to build the ship was strongly influenced by the views of the Controller of the Navy, Rear Admiral John A. "Jackie" Fisher and the Director of Naval Intelligence, Captain Cyprian Bridge who favoured smaller ships with a smaller main armament and large secondary armament. They pressed for additional ship of this type as

AttributesValues
rdf:type
rdfs:label
  • HMS Renown (1895)
rdfs:comment
  • Production of a new 12-inch gun was behind schedule and the three battleships planned for the 1892 Naval Programme that were intended to use the new gun had to be delayed. In their stead, an improved Centurion-class battleship design was chosen to keep the workers at Pembroke Dockyard fully employed. No formal requirement for a second-class battleship suitable for use as the flagship on foreign stations or to reinforce cruiser squadrons existed at the time, but the decision to build the ship was strongly influenced by the views of the Controller of the Navy, Rear Admiral John A. "Jackie" Fisher and the Director of Naval Intelligence, Captain Cyprian Bridge who favoured smaller ships with a smaller main armament and large secondary armament. They pressed for additional ship of this type as
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship image
  • 300(xsd:integer)
module
  • --02-01
abstract
  • Production of a new 12-inch gun was behind schedule and the three battleships planned for the 1892 Naval Programme that were intended to use the new gun had to be delayed. In their stead, an improved Centurion-class battleship design was chosen to keep the workers at Pembroke Dockyard fully employed. No formal requirement for a second-class battleship suitable for use as the flagship on foreign stations or to reinforce cruiser squadrons existed at the time, but the decision to build the ship was strongly influenced by the views of the Controller of the Navy, Rear Admiral John A. "Jackie" Fisher and the Director of Naval Intelligence, Captain Cyprian Bridge who favoured smaller ships with a smaller main armament and large secondary armament. They pressed for additional ship of this type as substitutes for the two other battleships originally programmed, but this was rejected by the Admiralty as there was no demand for additional second-class battleships. The Director of Naval Construction, William Henry White, submitted three designs in early April 1892 and the smallest one was chosen on 11 April. The design was quite innovative in several different ways. It was the first battleship to use Harvey armour, which allowed the secondary casemates to be armoured, the first to use a sloping armour deck and the first to provide armoured shields over the main armament.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software