About: SM U-115   Sponge Permalink

An Entity of Type : dbkwik:resource/8Vk4qvWWHqHVaZzlYvTCmQ==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

SM U-115 was a German Type U 115 U-boat (Projekt 43) of the Imperial German Navy built at Schichau-Werke, Elbing. As her sister ship , she was never completed and ultimately broken up in Danzig after the armistice. Her main engines were used in M/S Adolf Sommerfeld ex SMS Gefion. Both boats had been offered to the IGN free of charge by Schichau in an attempt to gain experience in building submarines. When construction of the two boats began to lag behind due to shortages in raw materials and lack of experience in submarine construction they were declared "war boats" (Kriegsboote), formally ordered by the Reichsmarineamt and given their respective designation. On 20 October 1918 Schichau-Werke reported U 115 would not be ready for delivery until the spring of 1919. Nevertheless 14 more boat

AttributesValues
rdf:type
rdfs:label
  • SM U-115
rdfs:comment
  • SM U-115 was a German Type U 115 U-boat (Projekt 43) of the Imperial German Navy built at Schichau-Werke, Elbing. As her sister ship , she was never completed and ultimately broken up in Danzig after the armistice. Her main engines were used in M/S Adolf Sommerfeld ex SMS Gefion. Both boats had been offered to the IGN free of charge by Schichau in an attempt to gain experience in building submarines. When construction of the two boats began to lag behind due to shortages in raw materials and lack of experience in submarine construction they were declared "war boats" (Kriegsboote), formally ordered by the Reichsmarineamt and given their respective designation. On 20 October 1918 Schichau-Werke reported U 115 would not be ready for delivery until the spring of 1919. Nevertheless 14 more boat
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
abstract
  • SM U-115 was a German Type U 115 U-boat (Projekt 43) of the Imperial German Navy built at Schichau-Werke, Elbing. As her sister ship , she was never completed and ultimately broken up in Danzig after the armistice. Her main engines were used in M/S Adolf Sommerfeld ex SMS Gefion. Both boats had been offered to the IGN free of charge by Schichau in an attempt to gain experience in building submarines. When construction of the two boats began to lag behind due to shortages in raw materials and lack of experience in submarine construction they were declared "war boats" (Kriegsboote), formally ordered by the Reichsmarineamt and given their respective designation. On 20 October 1918 Schichau-Werke reported U 115 would not be ready for delivery until the spring of 1919. Nevertheless 14 more boats of the class were ordered on 29 June 1918 for delivery in 1919.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software