On 1 March 2012 Miami pulled into the Portsmouth Naval Shipyard in Kittery, Maine for a scheduled 20-month Engineered Overhaul (EOH) and system upgrades. A civilian employee started a fire aboard the boat on 23 May 2012. It impacted the forward compartment of the submarine which includes crew living, command and control spaces and torpedo room. The revised estimate to restore the USS Miami increased to approximately $450 million with completion estimated on 30 April 2015. Due to budget cuts, it was announced August 6, 2013, that the vessel would not be repaired and placed on the inactive list.

AttributesValues
rdf:type
rdfs:label
  • USS Miami (SSN-755)
rdfs:comment
  • On 1 March 2012 Miami pulled into the Portsmouth Naval Shipyard in Kittery, Maine for a scheduled 20-month Engineered Overhaul (EOH) and system upgrades. A civilian employee started a fire aboard the boat on 23 May 2012. It impacted the forward compartment of the submarine which includes crew living, command and control spaces and torpedo room. The revised estimate to restore the USS Miami increased to approximately $450 million with completion estimated on 30 April 2015. Due to budget cuts, it was announced August 6, 2013, that the vessel would not be repaired and placed on the inactive list.
sameAs
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Ship caption
  • The USS Miami moored to a Port Everglades pier in April 2004.
Ship image
  • 300(xsd:integer)
module
  • --11-28
abstract
  • On 1 March 2012 Miami pulled into the Portsmouth Naval Shipyard in Kittery, Maine for a scheduled 20-month Engineered Overhaul (EOH) and system upgrades. A civilian employee started a fire aboard the boat on 23 May 2012. It impacted the forward compartment of the submarine which includes crew living, command and control spaces and torpedo room. The revised estimate to restore the USS Miami increased to approximately $450 million with completion estimated on 30 April 2015. Due to budget cuts, it was announced August 6, 2013, that the vessel would not be repaired and placed on the inactive list.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software