At the front of the Road Construction Vehicle is a door and retractable ramp used when the Gray & Houseman Explosives Truck needs to enter or exit the garage: the door rises and the ramp descends during these procedures. The garage has a turntable for trucks. At the bottom of the door are two lighting array troughs which contain spectrometers and ultrasound probes. On the roof next to the top of the door is a demolition gun, used in conjunction with the explosive truck to clear obstacles from its path. Behind the demolition gun is an armoured explosives magazine. On the other side of the explosives magazine is the reconnaissance helijet's maintenance hangar. Underneath the hangar is the road construction systems control room. Next to the control room is the bedrock distribution chamber. Fu
Attributes | Values |
---|---|
rdfs:label |
|
rdfs:comment |
|
dcterms:subject | |
dbkwik:thunderbird...iPageUsesTemplate | |
abstract |
|